PASSIVE 2-PHASE COOLING | STUTTGART, GERMANY

Superior Heat Dissipation for Critical Systems

Vapor chamber and thermosyphon systems with up to 10,000 W/mK — from idea to mass production, starting at 1 piece. All from a single source.

100% passive heat transport — zero power consumption
Automotive & industry quality (ISO 9001 / IATF 16949)
High production capacity & B2B supply chain from Stuttgart, Germany
Explore our Electronics Cooling Ecosystem:

Trusted by engineers & purchasing leaders at

BMW
BOSCH
NASA
SNCF

Industry Solutions & Applications

01 / 02

Engineering & Services

Our end-to-end product development process

Engineering & Design
Phase 1: Concept & Design

Engineering & Design

Custom thermal development from initial feasibility study to manufacturing-ready 3D CAD design. Direct collaboration with our thermal engineers in Stuttgart.

Learn More
Simulation (FEA & CFD)
Phase 2: Thermal Optimization

Simulation (FEA & CFD)

Transient thermal and CFD fluid simulation to validate performance before physical prototyping. Accurate numerical prediction of two-phase thermosyphon physics.

Learn More
Prototyping
Phase 3: Prototyping

Prototyping

Rapid functional prototype realization via precision CNC machining, Friction Stir Welding (FSW), and vacuum charging. Turnaround within 10–14 business days.

Learn More
Testing & Validation
Phase 4: Laboratory Testing

Testing & Validation

Comprehensive calorimeter test bench validation, helium leak testing, and PUE performance verification. Accredited testing reports from Stuttgart.

Learn More
Mass Production & Scaling
Phase 5: Mass Production

Mass Production & Scaling

Automated FSW production line with 100% inline helium testing. Scalable volume capacity up to 200,000 units per year.

Learn More

Global Manufacturing & Co-Engineering

From prototype development to global mass production.

Design for Manufacturing (DFM)Design to Cost (DTC)QA & Scale-up