HomeEngineering ServicesTesting & Validation
Testing & Validation

Testing & Validation

Comprehensive calorimeter test bench validation, helium leak testing, and PUE performance verification.

Get in Touch

Our Process

  1. 1

    Calorimetric Test Bench Setup

    Installing the ALVC heat exchanger into thermal test chambers equipped with high-precision heat sources (3–10 kW).
  2. 2

    Thermal Resistance (Rth) Measurement

    Mapping thermal gradients via infrared imaging and thermocouples to verify 10,000 W/(m·K) effective conductivity.
  3. 3

    Aerodynamic Flow & Pressure Drop Audit

    Measuring fan operating curves (V = 702 m³/h) and static pressure drop (ΔP = 230 Pa) across fin banks.
  4. 4

    Helium Leak Detection & Burst Testing

    Performing mass spectrometer helium leak testing to guarantee zero-leakage FSW weld integrity over a 10-year lifespan.
  5. 5

    Validation Certificate & ESG Report

    Issuing certified test documentation featuring verified PUE data (1.08–1.14) and compliance reports.

Ready to Start Your Project?

Contact our engineering team for a free consultation.

Get in Touch